Construction of RC Retaining Walls with Different Heights (2.5 to 6 meters) in Zone 3 of Slemani Heights Project for Qaiwan Company, in 2019 – As Sulaymaniyah
Tasks:
Supplying an average of 20 personnel per day with all needed tools
and machines and all
materials to construct RC retaining walls.
Size:
The RC retaining walls have different heights from (2.50) to
(6) meters.
Systems and
Components:
The retaining walls
are Cantilever type.
Supervision
The project is
supervised by the engineers from both of Qaiwan company (as Client) and Sharo
Engineering Office (as Project Supervision Engineering Office).