Earth Works of Solid Steel Factory and Civil Works of Rolling Mill Hall, for Solid Quality Company, in 2022 – Kifri
Tasks:
Supplying all the machines
and Equipment for preparing, cutting and filling of the project site, supplying an average of 30 personnel per day with all needed tools and machines and
all the construction materials to construct the civil works of Rolling Mill civil
works.
Size:
- Area of the project
site is (249,293 m2)
- Total quantity of cutting is (402,352 m3)
- Total quantity of filling is (104,204 m3).
- The Rolling Mill Hall
area is (16,749 m2) which is contain:
(170) RC Single Footings
(163)
RC Pedestals
(702 m) length RC Tie Teams, and
(567 m) length RC Walls.
Systems and
Components:
The Rolling Mill Hall
consists of:
- RC Single Footings
- RC Pedestals
- RC Tie
Beams
- RC Walls on exterior tie beams.
Supervision
The project is
supervised by the engineers from both of Solid Quality company (as Client).