Civil Works of First Phase of Wheat Marketing Project (Flour Mill Factory), for Qaiwan Company, in 2021 – As Sulaymaniyah
Tasks:
Supply an average of 90
personnel per day with all needed tools and machines and all the construction materials
to construct the civil works of the project.
Size:
- (12) Silo Foundations with (25.3) meters diameter.
- Tunnels under the silos with (306) meter length.
- Flour Mill Factory with two joints, and (2846 m2) building area
Systems and
Components:
- The silo foundations are RC Raft Foundations
- The Tunnels are RC Raft Faoundations and RC Walls, where the silo foundations sit on the walls
- the flour mill factory is a structural frame divided by (5) joints with the following main components:
RC Raft Foundation
RC Columns
RC Solid Slabs
Supervision
The project is
supervised by the engineers from both of Qaiwan company (as Client).